Loading…
Welcome to the Intermountain Section AWWA’s 2021 Annual Conference
Back To Schedule
Friday, October 11 • 10:30am - 11:00am
3 Kings Water Treatment Plant: Maximizing Treatment Capability and Visual Appeal on a Constrained Site

Sign up or log in to save this to your schedule, view media, leave feedback and see who's attending!

Park City Municipal Corporation (PCMC) has been issued Utah Pollutant Discharge Elimination System (UPDES) permits for the discharge of waters from Judge and Spiro Tunnels. PCMC entered into a Stipulated Compliance Order (SCO), concurrent with the issuance of the permits, which established schedules and certain terms and conditions for bringing the tunnel water metals discharges into compliance with the UPDES permits. The mine tunnel waters are currently used by PCMC (and other entities) for municipal drinking water, irrigation, and snowmaking.

In 2016, PCMC conducted pilot-scale testing to evaluate treatment alternatives for these water sources which formed the basis of design for the new 7.2 million gallons per day (mgd) 3Kings Water Treatment Plant in Park City. Based on the results, a treatment design approach was developed to address challenging water quality, optimize the facility layout to fit within a highly space constrained site, and balance the demand for visual appeal to the public.

This presentation will discuss the treatment technologies selected, process design approach, and how challenges were addressed while achieving architectural appeal.

Speakers
SM

Sean Menk

Principal Technologist, Jacobs
Sean Menk is a water treatment engineer with Jacobs in the Salt Lake City, Utah, office. Sean has been with Jacobs for over 7 years working on drinking water treatment projects.


Friday October 11, 2019 10:30am - 11:00am MDT
Boiler Room